La Camorra, Venezuela Gold - Monarch Resources / Hecla Mining
300,000 ounces per year high grade gold benefaction facility in Myanmar Burma
- Conceptual Design
- Feasibility Study
- Detail Engineering Design
- Procurement and Construction Management
- Capital and Operating Cost Estimate
Santa Cruz Project - ASARCO / Freeport McMoRan Copper
100 ton per month cathode copper solvent extraction - electro-winning plant
- Detail Engineering Design
- Procurement and Construction Management
- Eventual Dismantle and Ship to Israel
Copper Solvent Extraction/Electro-winning Facility
50,000 ton copper heap leach pad, PLS ponds, raffinate ponds and emergency storage ponds
- Detail Design
- Procurement and Construction Management
SO3 Cooler - Phelps Dodge Miami
Replaced an old failing SO3 Cooler with a new design heat exchanger
- Detail Engineering Design
Lucky Friday Mill Upgrade - Hecla Mining Company
Upgrade flotation plant in Mullan, Idaho
- Detail Engineering Design
Iron Oxide Processing Facility - Arizona Oxides, Inc.
A facility for ore receipt, crushing, fine grinding, pulverization, sampling, blending, dust collection and
product packaging in Arizona.
- Detailed Engineering Design
- Procurement and Construction Management
- Project Management
Cerro Verde Copper Mine - Phelps Dodge, Buenaventura
In Uchumayo, Arequipa, Peru with annual yield of 169 Mlb copper
- Feasibility Study and Cost Estimation
- On-Site Pilot Heap Leach Study
- Heap Leach Facility Design
- Construction Management
EAF Dust Plant Project - Elkem Technology
Electric arc furnace dust processing facility
- Detail Engineering Design
- Construction Management
Chang Shan Hao Gold Mining - Jinshan Gold Mines
20,000 ton per day crushing plant with 35.93km2 mine area in Inner Mongolia, China
- Pilot Test and Metallurgical Test
- Detail Engineering Design
- Bankable Feasibility Study (43-101)
- Procurement and Construction Management
- Project Management